Upgrade Oudelandertocht
- Blog_field_Dienst Leidingbouw
Commissioned by Nederlandse Gasunie N.V., De Romein Group has completed the upgrade of the Oudelandertocht. The upgrade involved replacing the DN20 shut-off valves.
Features:
- Installation of the water well;
- Manual excavation and vacuum truck excavation of the work pits;
- Temporary support of pipes, cables, and instrumentation;
- Ensuring the operability of the three plug valves using scaffolding;
- Maintenance of the water well and work pits;
- Refilling the work pits;
- Restoring the ground level;
- Removing excess soil (including sand, gravel, earth, etc.) and replenishing shortages;
- Cultural and technical restoration of construction and assembly areas in accordance with GTS.