Upgrade Oudelandertocht

  • Blog_field_Dienst Leidingbouw

Commissioned by Nederlandse Gasunie N.V., De Romein Group has completed the upgrade of the Oudelandertocht. The upgrade involved replacing the DN20 shut-off valves.

Features:

  • Installation of the water well;
  • Manual excavation and vacuum truck excavation of the work pits;
  • Temporary support of pipes, cables, and instrumentation;
  • Ensuring the operability of the three plug valves using scaffolding;
  • Maintenance of the water well and work pits;
  • Refilling the work pits;
  • Restoring the ground level;
  • Removing excess soil (including sand, gravel, earth, etc.) and replenishing shortages;
  • Cultural and technical restoration of construction and assembly areas in accordance with GTS.