Expansion of Gasunie OLS

  • Blog_field_Dienst Civiele techniek

On behalf of N.V. Nederlandse Gasunie, De Romein Group executed the Deventer OLS project. This project was divided into three sub-projects: relocating the testing area & reorganizing the warehouse, optimizing the housing conditions, and expanding the assembly hall.

For this project, we carried out the following tasks:

Parking Lot

  • removal of the existing paving
  • supply and installation of drainage and catch basins
  • grading to the construction height
  • finishing the sand bed
  • supply and installation of approximately 4000 m2 of concrete pavers
  • supply and installation of approximately 750 meters of concrete curb
  • supply and installation of street lighting

Assembly Hall Construction

  • supply and installation of steel pipe piles
  • installation of the foundation beam
  • supply and placement of 63 tons of steel structure
  • supply and installation of approximately 1500 m2 of cladding
  • supply and installation of approximately 600 m2 of roofing
  • supply and placement of 172 concrete slabs
  • supply and placement of a 20-ton overhead crane

Internal Renovation of Canteen and Offices

  • demolition and removal work
  • supply and installation of floor tiles
  • supply and installation of carpet tiles
  • supply and installation of sliding partitions
  • supply and installation of the kitchen unit

Internal Renovation of Warehouse and Welding Area

  • demolition and removal work
  • installation of approximately 150 m2 of concrete floor
  • supply and placement of approximately 150 m2 of aerated concrete walls
  • supply and placement of approximately 110 m2 of hollow core slab flooring
  • application of coating on concrete floors
  • supply and placement of steel staircase and railing
  • supply and placement of warehouse lift
  • supply and placement of overhead door

Internal Renovation of Testing and Workshop Area

  • demolition and removal work
  • supply and installation of steel pipe piles
  • installation of foundation beams
  • installation of approximately 250 m2 of concrete floor
  • supply and placement of approximately 275 m2 of cellular concrete block walls
  • application of coating on concrete floors
  • supply and installation of frames
  • supply and placement of steel staircase and railing
  • supply and placement of overhead door
  • supply and placement of a 5-ton overhead crane

The Challenge

In the warehouse and testing area, we worked with multiple concrete floors treated with a specific type of liquid-tight coating. This makes the floor highly durable and slip-resistant.

Height Difference

The height difference on the site posed a challenge. We addressed this by installing a retaining wall. Afterward, the construction of the assembly hall could begin.

Parking Lot

A portion of the parking lot needed to remain accessible for Gasunie employees during the work process. Therefore, we staged these activities in phases.