Haren-Noord

  • Blog_field_Dienst Civiele techniek

On behalf of the Municipality of Haren-Noord, De Romein Group prepared a designated area for the construction of 110 residential homes.

For this project, we carried out the following tasks:

  • Excavating, transporting, and processing soil and sand
  • Installing approximately 1900 meters of sewage, sand, and rubble pathways
  • Constructing two prefabricated bike bridges
  • Applying around 10,000 m2 of open and closed paving


Sustainability and Safety

The wooden railings of the two prefabricated bike bridges are made from FSC-certified wood. Additionally, during the implementation of the residential phase, we collaborated with the project developers to ensure that the neighborhood was designed to be as accessible and child-friendly as possible.