Bee Recovery Bonnerkap
- Blog_field_Dienst Civiele techniek
Commissioned by the Water Authority Hunze and Aa's, De Romein Group has carried out stream restoration work. The project was located on both sides of the Hunze and the stream between Gieterveen and the national road N33.
Features:
- Various cleanup operations
- Removal of 2 weirs
- Removal of culverts approximately 475m
- Completion of earthworks for meandering, watercourses, and banks (soil excavation approximately 294,000 m³, transportation of sand)
- Construction of barriers in the Hunze
- Installation of weirs in the stream
- Installation of culverts approximately 330m
- Construction of weirs
- Execution of a directional boring 30m
- Implementation of soil and embankment protection
- Installation of various pavements approximately 1700m
Safety:
- KOMO (certificate with product certification)
- KIWA certification for construction materials intended for water pipes
- KEMA certification for construction materials intended for cable work
- GASTEC QA mark for construction materials intended for gas pipelines
- NAKT, self-declaration, quality mark, or seal