On behalf of Grondexploitatie Maatschappij Meerstad CV, De Romein Group is carrying out work on the Meerstad project, Northern Main Access Plan 1.
The implementation of this project is primarily aimed at improving access to the new residential area De Zeilen. Borgweg will receive a new road connection, while Middelberterweg will have a temporary road connection.
Activities:
- conducting clearing operations
- cleaning and filling in waterways
- carrying out earthworks
- breaking up asphalt surfaces
- installing foundations
- laying street and asphalt surfaces
- installing concrete culverts
- installing concrete elements
- refilling and sowing verges
- marking roads
Construction
For the new road connection to Borgweg, we will create a cover over the existing concrete pressure sewer with a diameter of 1800 mm. To facilitate the installation of the double concrete culverts and concrete retaining walls at the Hoofdweg-Vossenburglaan roundabout, we will need to temporarily pump water from the Borgsloot.
Sustainability and Safety
The project contributes to CO2 reduction through the use of Stage V machinery. De Romein Group strives to ensure the highest possible safety standards in its operations and actively implements a safety policy to achieve this.